51) Which of the following is a basic assumption of linear programming? A) The condition of uncertainty exists. B) Independence exists for the activities. C) Proportionality exists in the objective […]
31) Which of the following is not a part of every linear programming problem formulation? A) an objective function B) a set of constraints C) non-negativity constraints D) a redundant […]
1) Management resources that need control include machinery usage, labor volume, money spent, time used, warehouse space used, and material usage. 2) In the term linear programming, the word programming […]
1) A medium-term forecast typically covers a two- to four-year time horizon. 2) Regression is always a superior forecasting method to exponential smoothing, so regression should be used whenever the […]
41) A medium-term forecast is considered to cover what length of time? A) 2-4 weeks B) 1 month to 1 year C) 2-4 years D) 5-10 years E) 20 years […]
13.1 PERT and CPM are quantitative analysis tools designed to schedule and control large projects. }13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a […]
10.1 In solving maximization assignment problems, (a) just reverse all the decision rules used in the minimizing algorithm (if it says subtract, now add, and so on). (b) convert the […]
10.1 Which of the following techniques can be used for moving from an initial feasible solution to an optimal solution in a transportation problem? (a) Hungarian method (b) stepping-stone method […]
10.1 In Table 10-17, which cell should be filled on the next iteration? Table 10-17 To==> 1 2 3 Dummy Supply From A | 10 | 8 80 | 12 […]
10.1 In Table 10-3, suppose shipping cost from source C to point 2 was 8, which below would be true? (a) There would be multiple optimal solutions. (b) The minimum […]